HIGHLANDS FIRE STATION

Location

Flagstaff, Arizona

Loven Contracting worked with Highlands Fire District on the Design+Build delivery of a 4,000SF Fire Administration Building addition to the existing Fire Station and a 2,400SF Pre-Engineered Metal Building for the Bear Jaw Wildfire Hand Crew.

Construction took place during a heavy monsoon season, requiring 8-foot over-excavation, fill, and compaction to prepare the site. During construction, our team identified a leak in the fire loop and drainage challenges that were causing failure of the surrounding pavement. Loven Contracting mitigated these issues via a 3’ over-excavation and substrate rebuild to support heavy vehicle traffic. Completing this concurrently with the original scope of work enabled our client to achieve meaningful savings and completed the project on schedule.