Kolb Studio

Kolb Studio

KOLB STUDIO

Location

Grand Canyon National Park, AZ

The preservation scope of work for Kolb Studio at the Grand Canyon National Park was designed to address degradation and the effects of increasing visitation to the historic site. Our team repaired and replaced-in-kind damaged log and shingle siding, structural beams, gutters, and wooden porches to ensure long-term integrity of the structure in the harsh Northern Arizona climate. Finishes on the exterior of the building required abatement prior to refinishing with historically appropriate linseed oil glazing compound and paint, as identified by historic preservation specialists. Loven Contracting also rectified drainage problems related to public sidewalks and corresponding retaining walls.

Throughout construction, Kolb Studio remained in operation and open to the visiting public. Loven Contracting’s extensive management of environmental controls and safety measures enabled the successful implementation of each phase of the project without impacting the quality of experience for the visiting public or National Park staff.

Related Projects

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

NPS Science & Resource Management Building

NPS Science & Resource Management Building

NPS SCIENCE & RESOURCE MANAGEMENT BUILDING

Location

Grand Canyon National Park, AZ

This project earned 19 out of 19 LEED points in the LEED Optimized Energy Performance category and was recognized for its exemplary regional design response to local Arizona conditions. This project also earned a Sustainable Building Award from Coconino County. 

The Science and Resource Management Building at Grand Canyon National Park, AZ, is an award-winning Design-Build, USGBC LEED-Platinum certified, and federally-funded project. The SRM Building was built in collaboration with Flagstaff-based Civil Design & Engineering (CDE).

CDE and Loven Contracting worked together to design the two-story, 8,900SF building, focusing on sustainability and incorporating the surrounding park’s architectural styles. Our construction services on the Science and Resource Building included office spaces, conference rooms, laboratories, a gray water collection system, a rainwater collection system, solar panels, and LED lighting throughout. The end-product is an environmentally friendly facility that blends into the landscape of the Grand Canyon National Park.

Related Projects

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Buckey O’Neill Cabin

Buckey O’Neill Cabin

Buckey O’Neill Cabin

Location

Grand Canyon National Park, AZ

This project was honored with the 2019 Governor’s Heritage Preservation Honor Award, as presented by the Arizona State Historic Preservation Office, and a 2019 ENR Award of Merit for Renovation/Restoration, as presented by Engineering News Record. 

The Buckey O’Neill Cabin is individually listed on the National Register of Historic Places and is located just feet from the South Rim at the Grand Canyon National Park. Built circa 1890 by a key figure in both Arizona State and U.S. National history, the Buckey O’Neill Cabin is one of the earliest examples of adaptive reuse of a historic structure.

A multi-disciplinary partnership, including Loven Contracting’s Historic Preservation Team, was formed with the following goals:

  • To ensure the integrity of the cabin for the next 129 years and beyond;
  • To return the cabin to a condition reflective of its appearance in 1935, when it was purchased by the Fred Harvey Company and incorporated into the Mary Colter-designed Historic Bright Angel Cabins and Lodge Complex;
  • To complete this preservation in a manner worthy of an important state and national landmark, utilizing best-in-class information, analysis, and construction techniques, while adhering to NPS Historic Preservation guidelines.

The team undertook an extensive preservation process, including painstaking materials matching, modification of contemporary tools to more accurately replicate the marks made by Buckey O’Neill during the original construction, and diligent documentation of every step to ensure accuracy. The result is truly exceptional. Loven Contracting is honored to share in the stewardship of this national icon and preserve it for future visitors to this UNESCO World Heritage Site and National Park.

         

Related Projects

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Highlands Fire Station

Highlands Fire Station

HIGHLANDS FIRE STATION

Location

Flagstaff, Arizona

Loven Contracting worked with Highlands Fire District on the Design+Build delivery of a 4,000SF Fire Administration Building addition to the existing Fire Station and a 2,400SF Pre-Engineered Metal Building for the Bear Jaw Wildfire Hand Crew.

Construction took place during a heavy monsoon season, requiring 8-foot over-excavation, fill, and compaction to prepare the site. During construction, our team identified a leak in the fire loop and drainage challenges that were causing failure of the surrounding pavement. Loven Contracting mitigated these issues via a 3’ over-excavation and substrate rebuild to support heavy vehicle traffic. Completing this concurrently with the original scope of work enabled our client to achieve meaningful savings and completed the project on schedule.

Related Projects

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Bright Angel Cabins Roof Replacement

Bright Angel Cabins Roof Replacement

BRIGHT ANGEL CABINS ROOF REPLACEMENT

Location

Grand Canyon National Park, AZ

Loven Contracting’s historic preservation carpentry team replaced the roofs and repaired key historic elements on the historic Bright Angel Cabins located in the historic Grand Canyon Village on the South Rim of this UNESCO World Heritage site.

Key to the success of this project was a site management plan that ensured minimal impact on the activities of park visitors and staff in a high-volume visitation zone. Specific components of the management plan included a phased project schedule that enabled us to reduce the size of the work area, screened fencing, and an adjusted work schedule to minimize work during high visitation days.

Loven Contracting’s ability to self-perform intricate carpentry work was utilized to replicate the historic textures of the original logs/viga via modified modern tools for efficiency and accuracy. Additionally, all paints were matched using NPS guidelines, and the original cedar shingles were replaced with in-kind materials for historical accuracy. Sustainable practices included the evaluation of and re-installation of salvageable original materials and meeting all client requirements.

Related Projects

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Mercedes Benz

Mercedes Benz

MERCEDES-BENZ OF FLAGSTAFF

Location

Flagstaff, AZ

Loven Contracting partnered with long-time client Martin Automotive Group to construct a 75,223SF state-of-the-art automotive dealership in Flagstaff, Arizona.

The architectural masonry facility is equipped with advanced technology features, including standard and oversized van lifts, ultra-durable Clinker tile, and an under-slab car exhaust system. Other features include interior glass walls and glass doors with in-floor door closers and full-height hardware throughout, as well as a machine room-less elevator to increase useable square footage.

The Mercedes-Benz of Flagstaff features two distinct climate control zones in the service and customer/office areas to enhance staff and customer comfort. To maximize cost savings, Loven Contracting worked closely with the architects to successfully adapt the specialized dealership architecture from electric to gas heat to align with Northern Arizona’s climate demands and produce significant long-term savings for the owner.

The project site also features three underground storm retention fields to maximize available parking space for the dealership. Loven Contracting installed LED lighting technology that complies with Flagstaff’s Dark Sky City ordinance while minimizing lighting costs.

Photos: Nick Laessig