Loven Contracting partnered with National Bank of Arizona for an interior and exterior restoration of the old Babbit’s Building located in Williams, Arizona. The scope of work included an entirely new interior, walls, and finishes as well as major structural upgrades, repairs, and new utilities installations.
Loven Contracting worked closely with the Historical Preservation Review Board of the City of Williams to restore the exterior stucco and paint to its original façade. A challenge of the project involved the condition of the existing bricks being inadequate for the new stucco finish. Loven Contracting utilized spray concrete tools to produce a smooth and flat stucco finish.
Loven Contracting provided all preconstruction services, design, budgeting and construction under our agreement with National Bank. With review of the original design, we were able to provide value engineering alternatives to preserve the client’s budget and complete the work on a tight schedule.
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Loven Contracting renovated and rehabilitated the Cataract Lake County Park in Williams, Arizona to increase the public’s utilization of the park’s space. To achieve this, Loven Contracting’s services on the 15.1-acre County Park renovation included replacing the existing park amenities – ranging from shade structures, ramadas, canopies, and bathroom facilities – with new, updated fixtures as well as adding several lakeside detention basins for improved flood control and drainage.
Additional amenities included asphalt driveways, concrete pathways, site lighting, horseshoe pits, playground area and equipment, boat landing, and parking area. Through Loven Contracting’s construction services, what began as an outdated recreation area became a renewed outdoor space that is now enjoyed by many outdoor recreationalists in the City of Williams, Coconino County, and across Northern Arizona.
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Loven Contracting acted as the general trades subcontractor for major renovations and capacity upgrades to the existing North Boiler Plant on the active Northern Arizona University campus in Flagstaff, Arizona. Scope of construction services included selective demolition to portions of the existing building while all critical utilities maintained continuous, uninterrupted operation.
Major structural upgrades included constructing underground concrete vaults and drilled-shaft caissons while protecting the existing structures, utilities, and steam tunnels in the plant and seismic and snow load upgrades to the existing building’s structure. Loven Contracting also provided architectural façade upgrades to the facility consisting of new curtain walls, brick veneer, and architectural panels. Interior upgrades to the North Boiler Plant included a new boiler plant control room, storage mezzanines, plant operator restroom, and shower and locker facilities.
To ensure public and student safety on the NAU campus during the project, Loven Contracting took additional safety precautions by increasing site signage visibility and focusing on public announcements to communicate project-related information.
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Loven Contracting completed a 3,000SF addition in conjunction with the Meteor Crater Natural Landmark‘s Visitor Center’s interior and exterior renovations in Winslow, Arizona. Originally designed by renowned architect Phillip Johnson and constructed at the site of a meteor impact berm in 1961, the revitalized visitor center features a contemporary lobby, reception area, gift shop, and a retail and ticketing center. Additional hardscape and landscaping enhancements were included to improve visitor circulation.
Loven Contracting developed management and safety plans that allowed for minimal impact on business functions and visitor experiences. Meteor Crater remained open to the public throughout the entire project, enabling visitors to this Northern Arizona landmark to enjoy the site unimpeded.
Photos: Loven Contracting superintendent and Nick Laessig
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
The Flagstaff Core Services Public Works Yard hosts the City’s new vehicle maintenance building, streets building, parks building, vehicle fueling facility, cold weather vehicle wash building, and administration building. The administration building is designed to LEED Silver Certification, while the remaining buildings feature an economical and utilitarian design to fulfill their projected use and heavy vehicle traffic.
Multiple issues and departmental needs required close collaboration and unique team solutions with numerous stakeholders to program and plan each aspect of the project. This ensured that key design elements implemented in the final project would work harmoniously with other departments.
Funding was very limited, requiring extensive and detailed value engineering and cost estimating of the building systems during preconstruction. Special considerations were incorporated into the site and building design to ensure that Flagstaff’s winter road maintenance fleet can react promptly when storm conditions are present.
Photos: Nick Laessig
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Loven Contracting constructed the 25,000SF Findlay Honda automotive dealership in Flagstaff, Arizona. A structural masonry building utilizing concrete slab-on-grade construction, the Findlay Honda in Flagstaff, AZ includes a 3,500SF showroom, a 4-bay quick lube center, a 5,700SF, 10-bay service center garage, and a spacious parking lot with 240 available spaces. All spaces of this dealership incorporate national brand standards. Loven Contracting is experienced in working within manufacturer requirements for timely delivery of automotive projects.
Loven Contracting completed construction on the facility under budget despite fuel, asphalt, and other cost escalations throughout the project. This was achieved by providing Findlay Honda with value engineering and cost estimating services that kept the project affordable.
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.